Santa Ana
Municipal Construction Bid
Stage:
GC and Sub Bidding
Bid Due Date:
November 12, 2025 (62 Day(s) Ago)
Submit Bids To:
Construction Type:
Trades
Cleaning and Construction Maintenance Concrete Construction Demolition and Site Construction Doors, Glass and Windows Electrical and Low Voltage Equipment / Supplies Exterior Improvements and Landscaping HVAC Masonry Construction Metal and Steel Construction Painting and Wallcovering Plumbing Preconstruction, Planning and Supervision Roofing, Thermal and Moisture Protection Wood Carpentry and Plastics Construction
Subtrades
Asphalt Paving Brick and Stone Concrete Cast-In-Place (Slabs) Concrete Reinforcement / Rebar Curb and Gutter Door Hardware and Access Controls Drainage and Containment Duct Work and Vents Electrical Power Electrical Supplies Electrical Wiring / Installation Erosion Control Exterior Doors Flashing Grading and Fill HVAC Equipment HVAC Installation Joint Sealant and Expansion Control Landscaping Line Striping Mechanical Insulation Metal Fabrications Mobilization Painting Parking & Traffic Control Plumbing Fixtures and Equipment Plumbing Installation Plumbing Supplies Post-Construction Cleanup Process Piping Rough Carpentry and Wood Framing Sanitary Sewerage Site Work / Excavation Structural Precast Concrete Structural Steel Erection Testing, Adjusting & Balancing
General Contractors: Post projects and invite subs & suppliers for free
Subcontractors: Submit bids to GCs and request estimates from suppliers
Suppliers: Submit material estimates to subcontractors bidding to GCs
No credit card required
No credit card required
Expand your network and connect with general contractors, subcontractors, owners, architects, and suppliers – not to mention thousands of relevant projects at your fingertips.
Generate relevant leads, faster and with precision. With access to private, hard-to-find projects, you can connect with architects and owners on projects still in the pre-design and design stages.
PlanHub’s advanced suite of bid management tools allows you to increase productivity, identify relevant projects using data, build bids with Takeoff, and manage bids through the entire process.