250 Years Strong. Join PlanHub for FREE & receive a $25 Visa Gift Card. (Valid for the first 100 new users only.)

COVID-19 Possible Impacts on Construction Industry

Toilet Papers

It’s no secret that COVID-19 is affecting all industries. As a contractor, you may be wondering if the construction industry and number of projects will slow down this month. It is important to lay out all the possible negative and positive impacts that the coronavirus could have on the construction industry, as well as giving guidance on what a prudent general contractor or subcontractor will do in these situations.

Key Takeaways

  • Supply chain disruptions can delay your projects, so proactively communicate with your customers about potential material shortages and build buffer time into your delivery timelines.
  • When lending tightens and project owners grow cautious, focus your energy on the projects that are still moving forward — those are the opportunities where your competition may pull back.
  • Historic low interest rates and government infrastructure stimulus can open up new project categories for you, so keep an eye on public and infrastructure bids that may not have been on your radar before.
  • Use slower periods to bid more aggressively — the suppliers and manufacturers who stayed active during past downturns came out ahead when the market recovered.
  • A preconstruction platform like PlanHub makes it easier to find and track active projects from anywhere, so you can keep your pipeline full even when market conditions are uncertain.

The possible negative effects in the construction industry from COVID-19:

·      Supply Chain Will Be Affected – Many factories worldwide have been shut down during this pandemic which will cause shortages or delays in building material, such as lumber, drywall, plumbing, electrical fixtures, and mechanical equipment resulting in delays in construction.
·      Banks May Tighten Lending Practices – In uncertain economic times, banks become risk adverse. There may be fewer projects getting funding until the economy shows signs of improvement.
·      Project Owners may get nervous and postpone new construction or slow down planned projects. Uncertainty in the economy will result in projects being on hold.

The possible positive effects in the construction industry from COVID-19:

·     Increase In Available Skilled Labor – Prior to this outbreak, there was a huge shortage for skilled labor, especially in MEP (Mechanical, Electrical, Plumbing) trades. With projects potentially slowing down, skilled labor may be more readily available allowing subcontractors to take on new projects from new general contractors (GCs) that they wouldn’t of had resources for before.
·     Low Interest Rates – With historic low rates, contractors can finance more projects and cover operating expenses with lines of credit.
·     Government Stimulus – The Federal and State governments are looking to pass unprecedented stimulus packages to boost the economy and get everything back on track quickly. Expect large investment in the infrastructure across the country.

Next Steps to Stay Ahead of the Curve

The best advise we can give during these uncertain times is to be very proactive and bid more. In today’s technology age, bidding from the comfort of your home could not be easier. A web-based pre-construction tool like PlanHub can help connect you to bid projects. As we personally witnessed during the great recession, the construction companies that continued to aggressively bid projects were the ones that came out stronger and more successful when the economy improved.
To learn more about PlanHub pre-construction software and how it can help keep your flow of projects steady, simply request a demo or contact us today.

Related Posts

madewell construction jordan madewell general contractor planhub case studymadewell construction jordan madewell general contractor planhub case study
How Madewell Construction Doubled Revenue in 4...
Texas Commercial General Contractor How Madewell Construction Doubled Revenue in 4 Years...
Read more
Insulation Masters team featured in a PlanHub customer success storyInsulation Masters team featured in a PlanHub customer success story
How Insulation Masters Scaled Revenue by 62%
Insulation Florida Commercial & Residential How Insulation Masters cut estimating time by 70%...
Read more
Dustin Warnock of James Blinds shares his experience using PlanHubDustin Warnock of James Blinds shares his experience using PlanHub
How James Blinds Grew from 150 to...
Blinds Ohio Commercial & Residential How James Blinds grew from 150 to 1,950...
Read more
How Suppliers & Manufacturers Find The Right Contacts To Get Their Products SpecifiedHow Suppliers & Manufacturers Find The Right Contacts To Get Their Products Specified
How Suppliers & Manufacturers Find The Right...
How Suppliers & Manufacturers Find The Right Contacts To Get...
Read more
Calculating the ROI of a Bid Management...
Calculating the ROI of a Bid Management Software Key TakeawaysAn effective...
Read more
How To Move from Residential to Commercial:...
How To Move from Residential to Commercial: A Certification &...
Read more
PlanHub

PlanHub

Administrator

Be the first to know

PlanHub insights, resources, and news, sent directly to your inbox.

Register for PlanHub to unlock:

No credit card required

Register for PlanHub to:

No credit card required

    
     <script charset="utf-8" type="text/javascript" src="//js.hsforms.net/forms/embed/v2.js"></script>
<script>
  hbspt.forms.create({
    region: "na1",
    portalId: "7063061",
    formId: "ced7254f-5c61-49b9-9ce0-6f870b79a958"
  });
</script>
    
   

Get the report!

From the very beginning, PlanHub has been a place where people can do meaningful work and build strong relationships.

Come grow with us! We’re building innovative technologies that simplify preconstruction for everyone.

Estimation is a simple yet powerful digital estimating tool for general contractors, subcontractors, and suppliers that integrates with PlanHub’s existing Takeoff software
Create quicker, improved takeoffs effortlessly. PlanHub’s Takeoff aids your team in accurate, faster estimates, minimizing errors, and driving business growth.

Expand your network and connect with general contractors, subcontractors, owners, architects, and suppliers – not to mention thousands of relevant projects at your fingertips.

Generate relevant leads, faster and with precision. With access to private, hard-to-find projects, you can connect with architects and owners on projects still in the pre-design and design stages.

PlanHub’s advanced suite of bid management tools allows you to increase productivity, identify relevant projects using data, build bids with Takeoff, and manage bids through the entire process.