Kenosha
Retail Store Construction Bid
Stage:
GC and Sub Bidding
Bid Due Date:
April 16, 2026 (3 Day(s) Left)
Submit Bids To:
Construction Type:
Trades
Cleaning and Construction Maintenance Concrete Construction Demolition and Site Construction Doors, Glass and Windows Electrical and Low Voltage Exterior Siding and Masonry Fire Protection HVAC Interior Walls, Ceilings and Insulation Masonry Construction Painting and Wallcovering Plumbing Roofing, Thermal and Moisture Protection Wood Carpentry and Plastics Construction
Subtrades
Architectural Metals Backflow Prevention Concrete Cast-In-Place (Slabs) Concrete Cutting Concrete Walls (CMU) Damproofing and Waterproofing Drywall Installation Duct Work and Vents Dumpster Service Electrical Wiring / Installation Exterior Doors Exterior Painting Fire Alarms Firealarms Flashing Flat Roof FRP - Wall Panels Glass and Mirrors Glazing and Storefronts HVAC Installation HVAC, Duct and Vent Cleaning Interior Demolition Interior Sprinklers Lighting / Fixture / Fan Installation Metal Roofing Painting Plumbing Fixtures and Equipment Plumbing Installation Post-Construction Cleanup Refrigeration and Equipment Steel Trusses Testing, Adjusting & Balancing Water Heater Installation Window Film Windows
General Contractors: Post projects and invite subs & suppliers for free
Subcontractors: Submit bids to GCs and request estimates from suppliers
Suppliers: Submit material estimates to subcontractors bidding to GCs
No credit card required
No credit card required
Expand your network and connect with general contractors, subcontractors, owners, architects, and suppliers – not to mention thousands of relevant projects at your fingertips.
Generate relevant leads, faster and with precision. With access to private, hard-to-find projects, you can connect with architects and owners on projects still in the pre-design and design stages.
PlanHub’s advanced suite of bid management tools allows you to increase productivity, identify relevant projects using data, build bids with Takeoff, and manage bids through the entire process.