- What Value Engineering Really Means for Subcontractors
- Where to Find Value Engineering Opportunities in the Drawings and Specs
- How to Vet a VE Option Before You Propose It
- How to Present VE Options That Win Work
- Example of a Value Engineering Proposal Log
- What to Include in a Winning VE Proposal
- Value Engineering on Public and Federal Projects (VECP)
- Value Engineering Mistakes That Cost Subcontractors the Job
- Conclusion
Introduction
A low price bid often wins the job, but it can also mean racing other subcontractors to the bottom bargain price. So how do subcontractors strike a balance? The answer is to look at value, rather than price.
Value engineering is the concept of subcontractors offering more value to general contractors by finding the optimal blend of cost, efficiency, and material quality. This process allows subcontractors to identify how to complete a project at the greatest value possible. It also offers an opportunity to build trust and credibility with general contractors, demonstrating a proactive approach and consideration for the general contractor’s best interests.
Winning subcontractors are able to submit stronger bids by proposing smarter, cheaper-to-build project plans that maintain a high standard of quality while preventing risk. For skilled subcontractors, effective value engineering can be the difference between winning a project by saving the general contractor money on a project and being overlooked.
This guide provides insight into what value engineering for subcontractors is, where to find opportunities in drawings, how to vet alternative offerings, and how to present value engineering options to general contractors when bidding to achieve buy-in.
Key Takeaways
- Presenting both the as-designed bid and your VE alternative in the same proposal shows general contractors you've done your homework — and gives them a clear, side-by-side reason to choose you.
- Use your trade expertise to identify 'or equal' material substitutions on the highest-cost line items first, then back up your recommendations with cut sheets and manufacturer data to build immediate credibility.
- Before proposing any VE option, pressure-test it against the questions a GC or designer will ask — covering code compliance, performance specs, warranty coverage, and your crew's ability to actually install it.
- Lead time savings can be just as valuable as cost savings, so tap into your supplier network to identify materials that are locally available or faster to procure and make that schedule impact visible in your proposal.
- Position your VE suggestions as problem-solving, not cost-cutting — when you help a GC submit a stronger bid to the owner, you become the kind of subcontractor they want on every future project.
What Value Engineering Really Means for Subcontractors
Value engineering is not a case of minimizing scope or cutting corners to trim costs or sacrifice quality; instead, it is the concept of providing the best level of work at the right balance of quality and cost to provide the greatest value to general contractors and project owners.
VE in construction may include recommending lower-cost, “or equal” substitutions for materials, suggesting an optimized construction schedule, or offering alternative and more streamlined construction methods.
For example, a subcontractor may suggest an electrical fixture that costs $200 less than the fixtures recommended by the project owner but with similar specs. Or, they may find similarly priced countertops for a project that can be procured twice as fast.
Put simply, subcontractors are trade experts, so they have the perspective and experience to propose better materials, methods, or sequences than what the designer specified. A skilled subcontractor with real-world installation experience and industry knowledge can suggest and build an estimate with equivalent materials in order to deliver a high standard of work at a more favorable price or timeline.
Value Engineering vs. Cutting Corners
Remember: Value engineering is not cutting corners or cheapening the job. Any value engineering recommendations should maintain rigid safety standards, functionality, and remain up to spec with what the project requires. Suggestions that appear to be unnecessary cost-cutting are likely to be rejected or overlooked entirely by general contractors and project owners.
Why “Bid Better, Not Lower” Wins More Work
Attempting to submit the lowest possible bid is not a winning strategy, and often suggests that a subcontractor provides subpar work at commodity pricing. However, if you can submit a bid that demonstrates your ability to deliver high-quality work at a better value than competitors, then general contractors are unlikely to pass up your services.
The Associated Builders & Contractors have statistics that show building material costs alone have risen by 37.7% since 2020. Consistently rising prices mean that project owners and contractors are looking for any way to cut budgets without cutting quality, and a subcontractor can be the expert who suggests an equivalent quality solution that improves margins and wins their favor.
Thoughtful value engineering options change the conversation, positioning the subcontractor to stand out as a problem-solver who helps the general contractor win the job with a lower bid now and avoid a hit to the owner’s budget later.
Where to Find Value Engineering Opportunities in the Drawings and Specs
Value engineering opportunities range from identifying room for lower-cost line items to adjusting sequencing and scheduling to protect against costly waiting periods. Subcontractors may consider some of the following opportunities to enhance value.
Materials and “Or Equal” Substitutions
One of the first places to look to add value is the material list by identifying alternative options at better pricing. The key to value engineering of materials is to choose an “equal” alternative, meaning that it holds the same standards of safety, performance, and quality.
For example, a subcontractor may recommend lower-price light fixtures that maintain the same quality as the originally suggested fixtures or a porcelain floor tile that mimics the natural stone with no noticeable appearance change. Subcontractors may choose to look through the highest cost line items across architectural, structural, and MEP plans first and identify opportunities to suggest higher-value options.
Subcontractors are expected to demonstrate and prove equivalence to the general contractor through cut sheets or manufacturer data. This is easiest when the subcontractor has materials they already know and trust.
PlanHub provides subcontractors with access to an expansive network of 48,000+ suppliers to make it easier to identify the different options available. The availability of this network makes it easy for subcontractors to request material estimates from a broader base of suppliers, even specifically mentioning the value engineering goal.
Suppliers are much more well-versed in the latest and greatest materials, with large estimating teams explicitly focused on identifying the most effective options at the right price. Subcontractors who use PlanHub can easily send an estimate request to all suppliers who serve their location and trades in one click.
Means, Methods, and Constructability
Subcontractors may be able to add value to the project not only by the materials they use, but by the processes they use. Cutting labor hours is a great way to engineer a better value for project owners and general contractors by using different construction methods and approaches.
Common construction methods that serve as great value engineering examples include:
- Modular assemblies that minimize labor and optimize construction by overcoming on-site variables like weather delays
- Thoughtful prefabrication that ensures predictability by preventing oversights and on-the-job adjustments
- Choosing materials with an easier installation process that saves time and labor costs
For example, a subcontractor may suggest alternative duct routing or piping layouts in order to optimize for standard sizes and available materials. This suggestion can minimize the need for cutting, additional welding, or hangers, all speeding up the installation process and reducing costs without changing the materials themselves.
The ability to make the construction process more efficient without special tools or rework can provide considerable cost savings. Keep in mind that you should have a good view of the project schedules to ensure that changes do not create downstream conflicts.
Long-Lead Items and Schedule Savings
Even if materials are comparable in cost, finding alternatives that shorten lead times can save a project considerable value in its margins. General contractors want schedule certainty and confidence in project timelines. Subcontractors who have a strong pulse on expected shipment dates and can make adjustments where possible to speed up deliverable timelines can make an important impact.
For example, subcontractors who have strong relationships with suppliers can often procure basic materials faster with less energy spent on negotiating shipments or identifying deals. Similarly, a subcontractor who has access to local supplies with a reduced shipment time may be able to obtain materials weeks ahead of schedule.
These advantages allow schedules and transfers to flow more efficiently, protecting overhead. In your proposal, be sure to share information on the schedule impact of the change and potential savings in labor or overhead, rather than just the cost change.
Access to PlanHub’s network of suppliers is an advantage here too. By putting out a request for estimates on supplies with a message requesting information on lead times, subcontractors can identify the best opportunities to add value to the project.
Find the Right Work and Bid Smarter
PlanHub’s subcontractor bidding tools empower you to review project plans, identify opportunities to add value, and develop winning bids to general contractors.
How to Vet a VE Option Before You Propose It
The key to general contractor buy-in for a value engineering option is to understand and pressure-test the option yourself before proposing it. Ensuring up front that your proposal is truly better for value while maintaining compliance protects both the project and your reputation with the general contractor.
Pressure-Test the Alternative Before Proposal
Before submitting your VE proposal, it is recommended that you stress test the suggestion to make sure the recommendation holds up against possible counterpoints. Double-check the suggestion yourself and consult a member of your team to provide a second pair of eyes.
Get in front of answering questions the general contractor, designer or owner may ask, like:
- Does the alternative option meet code?
- Does it meet the specifications’ required performance?
- Will the manufacturer and warranty back the alternative?
- Can your crew confidently install the option?
- Is the change realistic and attainable?
If you are suggesting a material change, consider that the product is available at the price you proposed and with a reasonable lead time. Before suggesting a number on a bid, it can be helpful to verify the cost and lead time with the supplier.
PlanHub’s takeoff & estimation tools provide confidence in pricing, with a cost library so you can more accurately estimate construction costs and improve the accuracy of your bids and VE suggestions.
If you are suggesting a scheduling or process change, make sure that it is realistic and achievable. Tying your hands with a suggestion you cannot actually fulfill can result in lost trust, affected relationships, and damaged margins down the project line.
Price It Honestly: First Cost vs. Lifecycle Cost
Honest pricing is important for transparency and communication with stakeholders while also allowing a smooth review process. Itemize your cost proposals so the as-designed cost and VE costs are easy to place side-by-side. A clear format allows the owner or general contractor to perform a 1:1 review and visualize the affected cost change.
Strongly weigh the long-term implications as well since this will be important to the general contractor. How does your proposal affect maintenance costs? Is there an effect on energy usage? The upfront costs are not the full picture, so try to paint it all.
Finally, avoid inflating savings for the sake of optics or to improve your chances of winning a bid. A number that you can defend and that the general contractor can trust is worth more than a larger number they cannot.
How to Present VE Options That Win Work
Understanding how to present value engineering options is key to proving your case and standing out to the general contractor or project owner. A clearly organized proposal makes it easy for them to understand your suggestion, have the conversation, and gather a positive impression that is more likely to win more construction bids.
Submit Both Numbers: The As-Designed Base and the VE Alternate
Rather than placing all of your confidence in your VE proposal being accepted, provide both your bid for the materials as the project is designed and your bid with the proposed changes. Offering both numbers shows that you were committed enough to read all of the documents and fully understand what was being asked, while also having proactive input for how to perform the project at a better cost.
Being mindful of this approach offers you the best of both worlds: even if the general contractor opts not to accept your suggestions, you have still provided the important information for how you would perform the project with the originally suggested project specs and plans.
PlanHub’s Bid Builder tool allows you to easily attach multiple files when submitting to the general contractor. When you submit your full bid, you can include an alternate bid in construction projects, proposing different costs and materials for the general contractor to review.
Structuring VE as Alternates or Line-Item Options
Instead of bunching items together in one proposal, it is recommended to present each idea as a clear line item with its own cost changes so the general contractor can review each item individually. This approach makes it easier to see how each change affects the project and provides the general contractor with the opportunity to approve or decline each change independently.
For visibility, label options clearly in your line items and include a clear reference to where the materials are found within the plans and specs provided.
Example of a Value Engineering Proposal Log
Base Bid Material | Base Specifications | Original Cost | Proposed Cost Change | Reference Location | Decision | Comments |
Base Bid Material | Base Specifications | Original Cost | – | – | – | |
Alternative Material 1 | New Specifications | New Cost | Price Difference | (Document; Page) | Accept/Reject | |
Alternative Material 2 | New Specifications | New Cost | Price Difference | (Document; Page) | Accept/Reject |
Timing: At Bid vs. Post-Bid Value Engineering
Value engineering is typically an option both before and after the bidding process. However, if you are able to offer a value engineering proposal at the beginning of the project, it often puts less strain on project timelines.
VE timing options measure up like this:
- Bidding: Submitting a VE proposal during the bidding process can demonstrate a proactive approach and differentiate you compared to other subcontractors.
- Post-bid: A VE proposal after bidding can be helpful if a disruption to project budget or timeline is identified later on, but typically requires a greater pivot, rushed decisions, or last-minute changes that can cause delays.
Generally, submitting a VE proposal with your bid is preferred so that suggested changes can be reviewed upfront. However, this may also depend on the preferences of the general contractor or owner reviewing bids.
It is recommended to review the bidding rules and project documents provided by the general contractor, as some have strict requirements for when and how alternates can be submitted, and for what products.
What to Include in a Winning VE Proposal
A winning VE proposal makes the approval process easy for general contractors, allowing the important project stakeholders on their team to understand the change and have a meaningful conversation about it. The general contractor should be able to send your proposal directly to their team with confidence that all the context is provided in the proposal itself.
Factors like cost, schedule, performance, and risk should all be easily addressed on one page. Include a clear description, supporting cut sheets, and a decision prompt to make review easy.
A good proposal addresses the key questions a reviewer may provide before they ask, including what the change is, why it’s being suggested, and what the tangible impact on the overall project may be. A professional and organized proposal is not only easy to read with clear comparisons to the baseline project plans, but it also signals that you as a subcontractor are professional and easy to work with.
A Simple VE Proposal Checklist
When suggesting a change to add value, it is helpful to lay out all of the information for the general contractor in a clear and concise manner so they can make an informed decision. Consider this checklist:
- The specified item in the plans
- The proposed alternative
- The difference in cost between the two items
- The difference in labor cost between installing the two items
- Potential impacts to schedule
- A clear ask of the exact decision that needs to be made
- Warranty information about the item
- Any specifications and evidence of the item’s performance and safety
Additional evidence, such as manufacturer data and performance calculations, that demonstrate equivalence can help build your case for choosing the new item. This evidence demonstrates that any recommended changes are based on informed decisions that will provide greater value without sacrificing project quality.
Adding a simple checklist with a clear ask to general contractors in your subcontractor proposal template increases the chances that they can easily understand the reason for the suggested change and approve it.
Value Engineering on Public and Federal Projects (VECP)
Public and federal projects typically have their own built-in formal mechanism for suggesting value-engineering changes. Compared to private projects where value engineering is an available but optional process, value engineering change proposals (VECP) in public projects are encouraged by contract to urge subcontractors to find quality but cost-saving alternatives.
Shared-saving clauses in these contracts often state that savings must be shared between the project owner and the general contractor. These clauses provide the subcontractor with their own financial incentive to identify saving opportunities for the project and are key to how subcontractors win more bids.
The process for VECP is often more formal, with subcontractors expected to provide detailed documentation to justify the proposal and the savings calculations. VECPs also set rigid standards for spec requirements and performance standards to ensure accountability for stakeholders and avoid the risk of attempts to cut corners.
PlanHub’s Project Fit tool and Ask AI capabilities make it even easier to review documents, as they can help you quickly and easily find VE clauses in project documents and ask AI to identify VE opportunities with a citation of where they are found in the document.
Value Engineering Mistakes That Cost Subcontractors the Job
While value engineering can be great for subcontractors proving their ability to save general contractors on value, it can have consequences when not done carefully. Value engineering mistakes can range from failing to properly make your case to general contractors and appearing negligent to overpromising on savings.
Costly value engineering mistakes that can cost subcontractors a job include:
- Proposing a substitution unilaterally without comparing to the base plans
- Offering alternatives that appear to fall short of quality or safety standards
- Overlooking the owner’s stated intent for using select materials
- Missing the bid/alternate deadline
- Failing to prove equivalence between original materials and alternatives
- Underestimating costs of alternatives and having to submit change orders later
- Committing to project savings that are ultimately unrealistic
Altogether it’s crucial to have mapped out the entire value engineering proposal and your ability to deliver before submitting your proposal. Not only is the success of the project on the line, but so is your credibility and reputation.
Conclusion
Value engineering is a strategic approach to making your bid more attractive for general contractors and providing a high standard of work at a more favorable price or schedule. A smart value engineering proposal can build favor with general contractors, demonstrating a proactive commitment to reducing project costs without compromising quality. Bid better, not just lower.
PlanHub helps you succeed through every step of the bidding process, from helping you bid on the right projects to helping you build more informed bids that impress general contractors. Our subcontractor bidding platform provides a full suite of tools to streamline your process for finding and winning more construction bids.
Try PlanHub for free to experience what it’s like to join our subcontractor network and start bidding on projects.
Related Posts